Black River Road Reconstruction

Overview

The Town of Georgina has identified the need to reconstruct approximately 3,200 metres in two sections of Black River Road, from Dalton Road to the west and from Park Road to 2.3 kilometres eastward. Black River Road has deteriorated and requires reconstruction to maintain the road in good repair. The contractor will also establish a new paved roadside parking area for the existing water fill station located at the south-east corner intersection of Park Road and Black River Road.

The construction on Black River Road will begin on Aug. 8, 2024, and the majority of the work will be completed by the first week of September 2024, some minor works that are outstanding will be completed in the September/October of 2024.

Local residents will be updated periodically throughout the project.

Photos and videos

Photo

beat up road with ditch running next to it and snow on the ground

Public engagement

Town of Georgina

Patryk Frankiewicz
Senior Project Manager
Phone: 905-955-7091
Email: pfrankiewicz@georgina.ca 

Documents

Contact Us

26557 Civic Centre Rd,
Keswick, ON  L4P 3G1

T: 905-476-4301 / 705-437-2210
F: 905-476-8100
info@georgina.ca

Hours of Operation

Monday to Friday
8:30 a.m. to 4:30 p.m.