To get approval for any addition, modification, replacement or extension to the water distribution system, the developer will be required to submit, completed with all supporting documentation
- Engineering Form 1 Checklist for Consultant Submission
- Ministry of Environment - Record of Watermains Authorized as a Future Alteration (Form 1)
Ministry of Environment Form 1 supporting documents
The following documents related to the Ministry of Environment Form 1 process:
- Municipal Consent Requirements
- Water and Sewer Lateral Application Form
- Drinking Water Works Permit 119-201 - Issue 3
- Drinking Water Works Permit - Form 1 Checklist for Consultant Submission
- Drinking Water Works Permit - Form 016 Consulting Engineer Checklist
- Standard Operating Procedure W/WW11 - Watermain Testing and Commissioning Procedure
- Ministry of Environment - Director Notification Form
- Ministry of Environment - Record of Watermains Authorized as a Future Alteration (Form 1)