Park with pathway and trees and lake in background

Georgina has many parks and open spaces for every age group. Georgina's park system includes ball diamonds, soccer fields, artificial turf, tennis and basketball courts, accessible play apparatus for all ages, leash-free dog parks, outdoor skateboard parks, bike park, challenge course, splash pad, outdoor ice rinks (weather permitting), tubing, skiing and terrain park and other amenities such as volleyball courts, picnic shelters, beaches, washrooms and tables.

Park improvements

The Town of Georgina will be completing improvements at a number of parks in 2024. Full or partial closures of these parks will be required for construction work to be completed. The Town thanks residents for their patience while these park improvements are completed.

Check out our construction map to see what projects are upcoming.

Construction map

2024 scheduled park improvements

West Park and Udora Park

The Town is excited to announce that the playgrounds at West Park and Udora Park are scheduled to be replaced in 2024.

The total budget for the new playground in West Park is $150,000. The total budget for the new playground in Udora Park is also $150,000.

The playground replacements will be completed in fall 2024. The new playgrounds will feature creative and interactive designs for play spaces that are fun and engaging for the whole community. Playground equipment will be inclusive and accessible. Some of the new playground equipment pieces will include:

  • Composite structure with slides and climbing features
  • New swings
  • Curbed protective surface with engineered wood fibre
  • An accessible walkway to the playground

2023 park improvements

Bayview Park

empty playground with slides and a ramp up

106 Bayview Ave., Keswick

The Bayview Park was updated in the spring of 2023. The improvements included an interactive design with a high level of inclusivity and accessibility. Some of the new accessible playground equipment pieces:

  • Composite structure with slides and climbing features
  • New swings
  • Curbed protective surface with engineered wood fibre

Work begun in early May.

Funding for these improvements comes from Resolution c-2021-0300.

Gwendolyn Park

empty playground

empty playground

138 Gwendolyn Blvd., Keswick

The Town replaced the playground equipment at this park in Q3 2023.

Funding for these improvements comes from Resolution c-2021-0300.

Trails

Georgina offers a range of trail experiences and places to discover. These trails provide opportunities to explore your local neighbourhood and discover nearby natural areas. 

The majority of the Town of Georgina’s trails are multi-use, which are suitable for walking, hiking, jogging and cycling. Trail terrain ranges from compact gravel surfaces to asphalt sections through local neighbourhoods and community parks.

Trail Map

More information

For more information about Town parks, facilities and sports fields, visit the Facilities and Facility Rentals page. Alternatively, you can contact Service Georgina by email at info@georgina.caor by calling 905-476-4301, ext. 3001 for additional information.

Parks and Amenities Directory

Contact Us

26557 Civic Centre Rd,
Keswick, ON  L4P 3G1

T: 905-476-4301 / 705-437-2210
F: 905-476-8100
info@georgina.ca

Hours of Operation

Monday to Friday
8:30 a.m. to 4:30 p.m.