Valve Chamber Upgrades

Overview

The Town of Georgina recently commissioned the Connell water booster station. A water booster station increases water pressure and flow for users of the drinking water system. As part of the new booster station, valves on the drinking water system must be installed or upgraded.

This capital project will install or upgrade nine valves in the below locations in Town:

  1. The Queensway South at Church Street
  2. The Queensway South at Circle Ridge Drive
  3. Fontaine Drive east of Circle Ridge Drive
  4. The Queensway South at Spring Road
  5. Spring Road east of Ley Boulevard
  6. The Queensway South at Henry Street
  7. Henry Street at Annamaria Drive
  8. Annamaria Drive south of Henry Street
  9. Oakcrest Drive west of Annamaria Drive

Expected disturbances for this construction are listed below. Affected residents will be notified in advance of any direct disruptions.

  • Localized temporary water shutoffs
  • Temporary lane or road closures
  • Typical construction noise and dust

Reach out to the Town’s Project Manager for any questions or further information.

Photos

Example valve chamber

a rusted pile and valve chamber

Public engagement

Town contact

Owen Sanders, Senior Project Manager
osanders@georgina.ca
905-806-7470

Other contacts

Contractor

Master Utility Division Inc.

Contract Administrator 

Parsons Corporation

Timelines

Timelines

Construction is expected to start in July 2024 and be completed by the end of September 2024.